Biogas installation Horst, Netherlands

Horst, Netherlands

Back to references

Capacity: 62,000 tons per year

Delivery: 2012

This biogas installation was completely designed and built by Biogas Plus. The core of the installation is the pump system, the Vacuum Pressure Tank.