Biogas upgrading installation Laon, France

Laon, France

Back to references

Capacity: 1,200 Nm³ / hour biogas

Completion: 2021 (expected)

This gas upgrading installation was completely designed and built by Biogas Plus. The basis for reliable gas upgrading is thorough biogas cleaning. The biogas is therefore the first to pass through a washing tower, where all water-soluble contaminants and dust are washed out. Subsequently, the remaining H2S and VOCs are thoroughly removed with two activated carbon filters. The clean biogas is upgraded to natural gas quality with 3-stage membrane technology. A reliable screw compressor brings the biogas to the pressure required for the membranes and provides sufficient pressure for the injection of the green gas into the regional natural gas network.